Toledo 8+4L Crystal chandelier by Voltolina

Product information "Toledo 8+4L Crystal chandelier by Voltolina (MADRID/8+4.2)"

Crystal chandelier Madrid 8+4L by Venice Lighting Design

Crystal chandelier Made in Italy in classic style with lead crystal 24% PbO and frame in 24 KT gold or nickel. The Madrid 8+4L crystal chandelier is equipped with a total of 12xE14 bulb socket. 8 lamps are located in the lower area of the chandelier, the remaining 4 lamps in the upper area.

0 of 0 reviews

Leave a review!

Share your experiences with other customers.


Details
Brand:Venice Lighting Design
Article:MADRID 8+4L
Material:cristall, glass
Measure in cm:75xH58
Lights:E14
Nr. of lights:12
Wattage:12x40W
Lights inclusive:no
Seen cheaper ? Tell us where you have seen this article cheaper, and we will try to beat this price! Do you have any questions concerning this product? Do you have any questions concerning this product?
Request Form
The fields marked with * are required.
Privacy *
Serenade 8+4L Crystal chandelier by Voltolina
Crystal chandelier Parigi 8+4L by Venice Lighting Design Crystal chandelier Made in Italy in classic style with lead crystal 24% PbO and frame in 24 KT gold or nickel. The Parigi crystal chandelier is equipped with a total of 12xE14 bulb socket. 8 lamps are located in the lower area of the chandelier, the remaining 4 lamps in the upper area.

€963.80*
Delivery time 21 working days
Toledo 8L Crystal chandelier by Voltolina
Crystal chandelier Madrid 8L by Venice Lighting Design Crystal chandelier Made in Italy in classic style with lead crystal 24% PbO and frame in 24 KT gold or nickel. The Madrid 8L crystal chandelier is equipped with a total of 8xE14 bulb socket. 

€719.80*
Delivery time 21 working days
Toledo 6L Crystal chandelier by Voltolina
Crystal chandelier Madrid 6L by Venice Lighting Design Crystal chandelier Made in Italy in classic style with lead crystal 24% PbO and frame in 24 KT gold or nickel. The Madrid 6L crystal chandelier is equipped with a total of 6xE14 bulb socket.

€585.60*
Delivery time 21 working days